Steam boiler daily check: operator checklist

Daily operator check of a steam boiler: gauge glass and water level, low-water cut-off test, blowdown, feedwater pump, chemical dosing, working pressure, burner flame, safety valves and leaks.

16 checkpointsBoilers and steamVersion 1Updated

This template covers a high-hazard activity. Adapt it to your site’s written procedures, your equipment and local regulations, and have it approved by a competent person before use. When imported, it lands for review: a checklist as a draft, a procedure as inactive.

Use this template in FreeMaint

Free account: download it as PDF or Excel. Copying inspection checklists into your workspace is included from the Starter plan.

Already have an account? Sign in

What’s inside

Section 1 of 3

Water side

  • Gauge glass — Water level visible in the gauge glass and at the normal working level

    Pass / FailCritical risk
  • Gauge glass — Blow down the gauge glass

    Done / Not done
  • Gauge glass — Level returns promptly after the gauge glass blowdown

    Pass / FailHigh risk
  • Low-water cut-off — Tested per the site procedure: the burner locks out and the alarm sounds

    Pass / FailCritical risk
  • Bottom blowdown — Carry out the bottom blowdown as the water treatment schedule requires

    Done / Not done
  • Feedwater pump — Pump starts and stops on level, without leak or abnormal noise

    Pass / Fail
  • Water treatment — Chemical dosing running, dosing tank level sufficient

    Pass / Fail

Section 2 of 3

Steam and firing

  • Pressure gauge — Steam pressure within the working range

    Pass / FailHigh risk
  • Burner — Flame stable and of the correct colour, no smoke at the stack

    Pass / Fail
  • Burner control — No lockout, alarm or fault on the burner control

    Pass / Fail
  • Fuel train — Any fuel leak or gas smell around the burner train?

    Yes / NoNon-conforming answer: YesCritical risk

Section 3 of 3

Safety and boiler house

  • Safety valves — Sealed, not leaking or simmering, discharge pipe unobstructed

    Pass / FailCritical risk
  • Pipework — Any steam, water or condensate leak?

    Yes / NoNon-conforming answer: Yes
  • Boiler house — Ventilation openings clear, no combustible material stored, access routes clear

    Pass / FailHigh risk
  • Boiler log — Record pressure, water level tests and blowdowns in the boiler log

    Done / Not done
  • Remarks — Observations for the boiler supervisor

    Free textoptional

Reviews

No review yet.

Reviews come from companies that imported this template. Comments are checked before they are shown.

Questions about this template

Licence

Official FreeMaint template, free to use and adapt inside your FreeMaint workspace. An adaptation may be shared in the library under CC BY 4.0; its page then credits this template.

Templates are general guidance. They do not replace the manufacturer’s instructions, your site procedures or applicable regulations.

Equipment: Boilers and steam

Industries: Manufacturing, Food and beverage, Healthcare, Energy and utilities

Run these checklists from your phone

Import a template, schedule it on your equipment and record every inspection in FreeMaint. Free, unlimited users.

Use this template in FreeMaint

Free your maintenance