Lesson 10 of 10 · 9 min

Measuring and improving

Written by Melek Mehrez, founder of FreeMaint · Last reviewed October 11, 2026

Lesson objective

By the end of this lesson, you can track four indicators after go-live (backlog, preventive share, schedule compliance and MTTR), run a 30-minute monthly review, and recognize the six classic pitfalls of a CMMS rollout.

Go-live is the beginning of the results, not the end of the project. The goals you set in lesson 1 now have a source of figures: every request, work order and preventive task leaves a trace. The question becomes which figures to watch, and what to do with them.

This lesson keeps it simple: four indicators, one short monthly meeting, and the six pitfalls that most often stall a project in its first year.

Four indicators for the first year

Four indicators to follow every month
IndicatorHow it is calculatedWhat it tells you
BacklogHours of open work divided by the team's weekly capacity, in weeksWhether the team keeps up with demand
Preventive sharePreventive hours divided by total maintenance hoursWhether work is shifting from reacting to planning
PM schedule compliancePreventive tasks done on time divided by the tasks due in the periodWhether preventive plans are really carried out
MTTRTotal repair time (from breakdown to restart) divided by the number of repairs, on critical assetsWhether repairs are getting faster

These four are enough for the first year. They come straight from the work orders and what technicians record at closure, they connect to the goals of lesson 1, and they move within months. MTBF, availability and costs come next, once the history is long enough to mean something.

A 30-minute monthly review

Indicators only help if someone looks at them and decides something. Hold the same short meeting every month, with the same people: the maintenance manager, the sponsor, a production representative and a field champion.

  1. 1

    Read the four indicators (5 minutes)

    Compare them with last month and with the goal. Look at the trend, not at one month in isolation.

  2. 2

    Look at the repeat failures (10 minutes)

    The three assets that broke down most often this month: is the cause known, and is a plan or a fix in place?

  3. 3

    Decide on three actions at most (10 minutes)

    A frequency to adjust, a task list to rewrite, a spare part to stock. Each action has an owner and a date.

  4. 4

    Check last month's actions (5 minutes)

    Done, in progress or dropped, and why. A review whose actions are never checked becomes a ritual.

Example

Six months later at the packaging plant

Six months after go-live, the monthly review takes 30 minutes on the first Tuesday of each month. The backlog has fallen from five weeks to 2.5 weeks, below the three-week goal. Preventive work represents 29% of hours, on the way to the 35% goal due at twelve months.

Schedule compliance has reached 85%, but the review noticed that breakdowns on the second filler had not dropped: two tasks were being closed without the measurement being taken. The task list now asks for the measured value, and compliance is read next to breakdowns.

MTTR on the two filling lines has dropped from six hours to four, mainly because parts are now ready before the job starts. The figures go to the sponsor on one page, the same every month.

Six classic pitfalls

What stalls a CMMS project, and the lesson that prevents it
PitfallWhat it looks likeLesson
Duration underestimatedGo-live set for next month, and no time freed up2
Change management forgottenThe software is announced, never explained2 and 9
Data migrated all at onceDuplicates and gaps everywhere from day one3 and 6
Technicians left outChoices made in the office, forms nobody can fill in2 and 4
Messy data keptTwo names for the same machine, frequencies in three formats5 and 6
No pilotEvery problem discovered at once, across the whole site9

Stalled projects often show two or three of these at once. When one appears, go back to the lesson that prevents it: it is rarely too late to run a short pilot, clean a list or bring technicians back in.

After the first year

Once the four indicators are stable, widen the scope: cover the remaining assets with preventive plans if not done yet, add MTBF and availability on critical equipment, and follow maintenance costs per asset. Review the goals of lesson 1 once a year, and set new ones.

In FreeMaint

Included in Core (free)

Where these figures live in FreeMaint

In FreeMaint, the Dashboard shows open and overdue work orders, Analytics › Preventive calculates the Preventive share of maintenance, PM schedule compliance and PM backlog, and Reports › Assets gives MTBF, MTTR and availability per asset from recorded downtime. Analytics › Preventive counts work orders, not hours, and PM schedule compliance only looks at finished work: if you measured your baseline another way, keep measuring it that way. These screens are part of the free Core plan.

Read the documentation

Template for this lesson

Monthly indicator tracker and review sheet

Excel (.xlsx), blank, with formulas

Monthly indicator tracker and review sheet

Key takeaways

  • Follow four indicators in the first year: backlog, preventive share, schedule compliance and MTTR.
  • Read each indicator next to another one that would reveal a trick.
  • Hold the same 30-minute review every month, with at most three actions, each with an owner.
  • When a project stalls, look for the classic pitfalls and go back to the lesson that prevents them.

Check your understanding

A few quick questions. Nothing is recorded.

  1. 1. Schedule compliance has jumped to 98%, but breakdowns have not dropped. What should you suspect first?
  2. 2. Which four indicators does this lesson recommend for the first year?
  3. 3. How many actions should come out of a monthly review?
  4. 4. A project shows duplicates everywhere and technicians who refuse the forms. Which pitfalls are at work?