Fire alarm system weekly test checklist
Weekly fire alarm test: control panel healthy with no fault or disablement, one manual call point activated in rotation, correct zone shown, sounders audible and beacons visible everywhere, linked functions, reset and log book entry.
13 checkpointsFire safetyVersion 1Updated Imported once
Free account: download it as PDF or Excel. Copying inspection checklists into your workspace is included from the Starter plan.
Already have an account? Sign inWhat’s inside
Section 1 of 4
Control panel before the test
Control panel — Panel shows normal status, no fault indication
Pass / FailHigh riskPower supply — Mains and standby battery indicators normal
Pass / FailHigh riskDisablements — Any zone, detector or sounder left disabled?
Yes / NoNon-conforming answer: YesHigh risk
Section 2 of 4
Call point test
Notification — Warn occupants and, if the system is monitored, the alarm receiving centre
Done / Not doneCall point — Activate the next manual call point in the rotation with the test key
Done / Not doneControl panel — Panel shows the alarm in the correct zone or device
Pass / FailHigh riskSounders and beacons — Sounders audible and beacons visible in every area
Pass / FailHigh riskLinked functions — Linked functions operate as designed (door holders release, plant shutdown, signal transmitted)
Pass / FailHigh risk
Section 3 of 4
Reset
Call point — Reset the call point and the control panel
Done / Not doneControl panel — Panel back to normal, no fault after reset
Pass / FailHigh riskNotification — Tell occupants and the receiving centre that the test is over
Done / Not done
Section 4 of 4
Records
Log book — Record the date, the call point tested and the result in the log book
Done / Not doneRemarks — Call point reference and any defect found
Free textoptional
Reviews
No review yet.
Reviews come from companies that imported this template. Comments are checked before they are shown.
Questions about this template
Licence
Official FreeMaint template, free to use and adapt inside your FreeMaint workspace. An adaptation may be shared in the library under CC BY 4.0; its page then credits this template.
Templates are general guidance. They do not replace the manufacturer’s instructions, your site procedures or applicable regulations.
Equipment: Fire safety
Industries: Facilities, Hospitality, Healthcare, Education
More templates for this equipment
- Inspection checklistOfficial FreeMaint
Emergency lighting monthly test checklist
Monthly functional test of emergency luminaires and exit signs: charge indicators, short simulated mains failure, every fitting lit, escape routes lit, recharge after the test, physical condition and log book entry. Not the annual full-duration test.
13 checkpointsFire safetyImported once
- Inspection checklistOfficial FreeMaint
Fire extinguisher monthly inspection checklist
Monthly visual check of each portable fire extinguisher, in line with NFPA 10 / EN 3 practice: location, clear access, pressure gauge in the green, pin and tamper seal, body and hose condition, legible label, service date and inspection tag.
14 checkpointsFire safety
Run these checklists from your phone
Import a template, schedule it on your equipment and record every inspection in FreeMaint. Free, unlimited users.
Use this template in FreeMaintFree your maintenance