Checks to complete before closing a hot work permit: equipment made safe, the area and its surroundings inspected for smouldering, fire watch and final check completed, fire detection restored, hot debris collected and the area handed back.

12 itemsWorkplace safetyVersion 2Updated

This template covers a high-hazard activity. Adapt it to your site’s written procedures, your equipment and local regulations, and have it approved by a competent person before use. When imported, it lands for review: a checklist as a draft, a procedure as inactive.

Use this template in FreeMaint

Free account: download it as PDF or Excel. Copying HSE checklists into your workspace is included from the Starter plan.

Already have an account? Sign in

What’s inside

Category: Permit — post-work checklist

  • Permit type: Hot Work
  • Filled in on each permit concerned, before the permit is closed.

Imported as a draft: it is not used until you review it and click Activate on the HSE template. Once activated, it is used on every new permit of this type and replaces the checklist in use.

Checklist items

  1. Hot work equipment switched off and made safe

    Welding sets switched off, gas cylinder valves closed, hoses bled and coiled, and the equipment removed or secured.

    Pass / FailCritical: a failure blocks the permit
  2. Work area and surroundings inspected for smouldering and hot spots

    Including the floor below, the other side of walls and partitions, ceiling voids, ducts and any opening sparks could have reached.

    Pass / FailCritical: a failure blocks the permit
  3. Fire watch completed after the work (minutes)

    The time the fire watch actually stayed after the end of the work. Many standards and insurers ask for at least 60 minutes.

    NumberRequired
  4. Fire watch kept for the full duration set on the permit

    With an extinguisher at hand and no other task until the end of the watch.

    Pass / FailCritical: a failure blocks the permit
  5. Final check of the area done at the end of the monitoring period

    A last walk through the area and its surroundings, at the end of the periodic checks required by the site procedure.

    Pass / FailCritical: a failure blocks the permit
  6. Result of the final check

    ChoiceRequired
    • No anomaly found
    • Anomaly found and treated
    • Fire or smouldering found: alarm raised
  7. Fire detectors and sprinkler zones isolated for the work are back in service

    Restoration confirmed with the alarm receiving point. Answer « Pass » if nothing was isolated.

    Pass / FailCritical: a failure blocks the permit
  8. Hot debris collected in a metal container

    Slag, electrode stubs, grinding dust and offcuts collected once cold, in a closed metal container.

    Pass / FailCritical: a failure blocks the permit
  9. Protective blankets, screens and covers removed once cold, and the area left clean

    Pass / Failoptional
  10. The area owner has inspected the area and accepted it back

    The person in charge of the area confirms it can return to normal use.

    Pass / FailCritical: a failure blocks the permit
  11. Photo of the area after the work

    Photooptional
  12. Remarks

    Free textoptional

Reviews

No review yet.

Reviews come from companies that imported this template. Comments are checked before they are shown.

Questions about this template

Licence

Official FreeMaint template, free to use and adapt inside your FreeMaint workspace. An adaptation may be shared in the library under CC BY 4.0; its page then credits this template.

Templates are general guidance. They do not replace the manufacturer’s instructions, your site procedures or applicable regulations.

Equipment: Workplace safety

Industries: Manufacturing, Facilities, Energy and utilities, Construction, Food and beverage

Run these checklists from your phone

Import a template, schedule it on your equipment and record every inspection in FreeMaint. Free, unlimited users.

Use this template in FreeMaint

Free your maintenance