Checks to complete on each hot work permit before welding, cutting or grinding starts: combustibles cleared within 11 m, sprinklers in service, equipment inspected, gas tested where needed, fire watch assigned during and after the work.

22 itemsWorkplace safetyVersion 1Updated

This template covers a high-hazard activity. Adapt it to your site’s written procedures, your equipment and local regulations, and have it approved by a competent person before use. When imported, it lands for review: a checklist as a draft, a procedure as inactive.

Use this template in FreeMaint

Free account: download it as PDF or Excel. Copying HSE checklists into your workspace is included from the Starter plan.

Already have an account? Sign in

What’s inside

Category: Permit — pre-work checklist

  • Permit type: Hot Work
  • Filled in on each permit concerned, before the work starts.

Imported as a draft: it is not used until you review it and click Activate on the HSE template. Once activated, it is used on every new permit of this type and replaces the checklist in use.

Checklist items

  1. Type of hot work

    ChoiceRequired
    • Welding
    • Flame cutting
    • Grinding
    • Brazing or soldering
    • Other
  2. Hot work cannot be avoided

    No cold method (mechanical cutting, bolting) can be used, and the part cannot be moved to a designated hot work area.

    Pass / FailCritical: a failure blocks the permit
  3. Sprinkler and fire alarm systems in the area are in service

    Pass / FailCritical: a failure blocks the permit
  4. Detectors isolated for the work

    Zone isolated to avoid false alarms, by whom, and the time it will be restored. Leave empty if none.

    Free textoptional
  5. Combustibles removed within 11 m (35 ft), or protected

    What cannot be moved is covered with fire-resistant blankets or shielded with metal guards.

    Pass / FailCritical: a failure blocks the permit
  6. Floors swept clean of combustible debris

    Combustible floors are wetted down or covered with damp sand or fire-resistant sheets.

    Pass / FailCritical: a failure blocks the permit
  7. Openings in walls, floors, ducts and conveyors within 11 m are covered so sparks cannot travel

    Pass / FailCritical: a failure blocks the permit
  8. Flammable liquids, gases and dusts removed from the area

    Where they may still be present, the atmosphere is tested at the work point before work starts.

    Pass / FailCritical: a failure blocks the permit
  9. Gas test at the work point (% LEL)

    Record the reading when flammables may be present. Work only within the limit set by your site procedure.

    Numberoptional
  10. Tanks, pipes and containers worked on are emptied, cleaned, purged or inerted, and isolated

    Pass / FailCritical: a failure blocks the permit
  11. The other side of walls, partitions and ceilings has been checked for combustibles and heat transfer

    Pass / FailCritical: a failure blocks the permit
  12. Hot work equipment inspected

    Hoses, regulators, flashback arrestors, cables and earth clamps in good condition; gas cylinders secured upright.

    Pass / FailCritical: a failure blocks the permit
  13. A suitable fire extinguisher is at the work point, and the operator is trained to use it

    Pass / FailCritical: a failure blocks the permit
  14. A fire watch is assigned and present during the work

    Trained, with an extinguisher and a means to raise the alarm, and with no other task while watching.

    Pass / FailCritical: a failure blocks the permit
  15. Fire watch after the work ends (minutes)

    Many standards and insurers ask for at least 60 minutes, then periodic checks for several hours. Follow your site procedure.

    NumberRequired
  16. The operator wears the protective equipment the task requires

    Welding helmet or goggles, flame-resistant clothing, gloves and safety footwear.

    Pass / FailCritical: a failure blocks the permit
  17. Ventilation or fume extraction is adequate for the process and the space

    Pass / FailCritical: a failure blocks the permit
  18. Welding screens protect people nearby from arc flash and spatter

    Pass / Failoptional
  19. The area is cordoned off and signed “Hot work in progress”

    Pass / Failoptional
  20. The operator and the fire watch know the emergency number and the nearest alarm call point

    Pass / FailCritical: a failure blocks the permit
  21. Photo of the prepared work area

    Photooptional
  22. Additional precautions or remarks

    Free textoptional

Reviews

No review yet.

Reviews come from companies that imported this template. Comments are checked before they are shown.

Questions about this template

Licence

Official FreeMaint template, free to use and adapt inside your FreeMaint workspace. An adaptation may be shared in the library under CC BY 4.0; its page then credits this template.

Templates are general guidance. They do not replace the manufacturer’s instructions, your site procedures or applicable regulations.

Equipment: Workplace safety

Industries: Manufacturing, Facilities, Energy and utilities, Construction, Food and beverage

Run these checklists from your phone

Import a template, schedule it on your equipment and record every inspection in FreeMaint. Free, unlimited users.

Use this template in FreeMaint

Free your maintenance