Lesson 6 of 8 · 11 min

Preventive plans, meters and stock levels

Written by Melek Mehrez, founder of FreeMaint · Last reviewed November 16, 2026

Lesson objective

By the end of this lesson, you can set up a calendar plan and a meter-based plan with their required parts, tell a meter-based plan from an automated trigger, and set the stock levels behind the low-stock alert and automatic purchase requisitions.

Lesson 8 of Implementing a CMMS, Starting preventive maintenance, gives the method. This lesson configures it: the schedule type, what a late job does to the next date, what a meter-based plan needs to fire, and the stock levels behind the parts the plans use.

A preventive plan is a promise that FreeMaint keeps for the client. Set badly, it keeps the wrong one: a meter-based plan that nobody feeds never fires, a statutory inspection slips later every year, and the oil filter is missing on the day of the service. And the indicators built on top, such as those of the SMRP Best Practices Metrics, can only measure what these settings let FreeMaint record.

Choose the schedule type

Every plan has a Schedule type: choose it from what drives the wear.

Four schedule types
Schedule typeWhat creates the work orderWhen it fits
Time BasedAn interval: Every, then days, weeks, months or yearsWear that follows time, and obligations with a date
Meter BasedReadings on one meter: a work order each time it advances by the Threshold ValueWear that follows use, when use varies: hours, cycles, distance
HybridThe calendar or the meter, whichever comes firstWear that follows use but also ages with time
Specific datesA list of dates, repeated every yearSeasonal or irregular work

In EN 13306, the European maintenance terminology standard, work done at set intervals of time or use, without checking condition first, is predetermined maintenance. All four schedule types are predetermined.

Calendar plans: interval and reschedule mode

A Time Based plan starts at its Start Date, which is the first due date. In months, Repeat on can take a weekday, such as the first Monday, for work that needs a given shift or a planned stop; On these days only moves due dates off the days nobody is on site.

Reschedule mode decides what a late job does to the dates that follow.

Two reschedule modes
Reschedule modeThe next due dateWhen it fits
From completion date (the default)Counted from the completion: a job two weeks late moves every later date by two weeksWear that restarts with the work: lubrication, filters, cleaning
Fixed calendar (from due date)Stays on the calendar, whenever the last job was doneDated obligations: statutory inspections, certificate renewals, contract visits

Either way, a plan never stacks work orders: while its last one is open, it creates no other. Once that work order is closed, a fixed-calendar plan creates the occurrence it was held on, even if its date has passed, or only the latest one when a later date is already due too: it never creates one work order per missed date.

Time-based section of a new preventive plan: the Every and Unit fields, the Repeat on rule and the Reschedule mode list open on its two options

In FreeMaint

Included in Core (free)

Calendar plans in FreeMaint

PM Schedules, under Preventive, lists the plans; Create PM Schedule opens the form. Time Based and Specific dates plans, with their tasks and Required Parts, are free on every subscription, without limit. With Auto-create work orders on, Advance notification (days before due) creates each work order that many days ahead.

Read the documentation

Meter-based plans: meter, readings, threshold

A meter-based plan reads nothing by itself. It needs a meter, readings, a threshold and the meter's current position.

  1. 1

    Create the meter

    In Meters, New Meter: its asset, a type (Runtime for an hour meter), a unit, and Frequency, the days between two readings. A meter not read within its Frequency counts as overdue.

  2. 2

    Plan the readings

    Add Reading on the meter, a scan of its QR code, or a Meter reading step in a work order: each of these readings is checked against the plans and triggers. The reading asked when a job on the asset is completed only restarts the count of the plans that job satisfies: it never creates a work order. Schedule readings, on the meter's page, prepares a calendar plan that asks for it.

  3. 3

    Set the threshold

    Choose Meter Based or Hybrid, then the Meter Asset, the Meter and the Threshold Value: 250 for every 250 hours.

  4. 4

    Say where the meter stands

    Enter the Current Meter Reading, or Next due at reading for a machine partway through its interval. Left empty, the plan counts from zero.

The first of those readings that shows the meter has advanced by the Threshold Value since the last service creates the work order, even with Auto-create work orders off. The count restarts when that work order is completed, from the reading entered then or the latest one. Advance notification can warn the people assigned before the service.

Meter-Based Scheduling section of a new plan: the Meter Asset, the Meter chosen on it, the Threshold Value in hours, Current Meter Reading and Next due at reading

In FreeMaint

Included in Starter

Meters and readings in FreeMaint

Creating meters, entering readings and adding Meter reading steps need Starter; viewing and deleting meters stay free. A meter-based plan can be saved on any subscription, but has nothing to count without them. Below Starter, readings can no longer be entered on a meter or by a Meter reading step, so plans stop firing.

Read the documentation

A meter-based plan or an automated trigger?

A meter's page also holds Automated Triggers: they watch the same readings, but answer a different question.

Two mechanisms on the same readings
AspectMeter-based planAutomated trigger
QuestionHas the machine run its interval since the last service?Has a reading crossed a limit?
Compares each reading withThe reading at the last completed serviceA fixed value: Above, Below, Equals, or Change (delta) exceeds
CreatesThe plan's work order, with its tasks and required partsA work order from its Work order title and description (without a title, it creates none), or an inspection
After it firesWaits until that work order is completedSwitches itself off, unless Recurring: then it fires on every matching reading, after the wait you set
In EN 13306 termsPredetermined maintenanceCondition-based maintenance when the meter measures a condition, such as a temperature or a pressure; on an hour meter, still predetermined

An Above 250 trigger on a forklift's hour meter fires once and switches itself off; made Recurring, it fires on every reading above 250, for the rest of the forklift's life. Use plans for intervals, triggers for limits.

A meter's page with its latest readings listed by date and the Automated Triggers card holding one trigger, its condition and its action

In FreeMaint

Included in Starter

Automated triggers in FreeMaint

Creating and testing a trigger needs Starter; listing them stays free. Below Starter, readings fire no trigger, and FreeMaint tells the company that its meter threshold automations stopped.

Read the documentation

Required parts travel with the work order

Required Parts lists the spare parts a service uses. Each work order carries them as planned parts; nothing is reserved or deducted until the technician records a part as used, so stock levels still decide when to order.

Stock levels: when to order, how much

Each part carries its own levels, on its form.

Stock levels on a part
FieldWhat it meansHow to set it
Minimum Stock LevelThe safety stock you never want to go belowEnough to cover a failure while a late order arrives
Reorder PointThe level at which you orderThe minimum plus what you use during the lead time
Maximum Stock LevelThe ceiling of the shelfSpace, shelf life and cash tied up
Reorder QuantityWhat an automatic requisition asks forLeft empty, it tops up to the maximum
Lead Time (days)Days from order to deliveryThe supplier's real delay, not the catalogue's

The import of lesson 4 brings the minimum only, from its Min Quantity column: the other levels are typed on each part.

Stock fields of a new part: the initial quantity, Minimum Stock Level, Maximum Stock Level, Reorder Point, Reorder Quantity and Lead Time (days)

In FreeMaint

Included in Business

Stock transfers in FreeMaint

Moving parts between stores with Stock Transfers needs Business. It does not change the alert, which reads the total.

Read the documentation

The Low Stock page, under Inventory, lists the parts at or below their level. On Starter, Auto-create purchase requisitions adds each one to a single draft requisition for the company. A part already covered by an open purchase order or requisition is skipped. The draft belongs to nobody, so only a role that may update any requisition can review and submit it; then the approval workflow of lesson 5 applies.

Low Stock Alert page listing the parts at or below their level, with the Auto-create purchase requisitions switch above the list

Low Stock Alert and Out of Stock are company notification events. In Company Settings › Notifications, Advanced notification configuration sets their channels, the roles that receive them and a Reminder while a part stays low. Send them to the people who order.

Notification Configuration page on the Low Stock Alert event: its channels, the roles chosen as recipients and the Reminder cadence

In FreeMaint

Included in Core (free)

Stock levels and alerts in FreeMaint

Stock levels, the Low Stock page and both notification events work on every subscription. Choosing who receives a notification needs the permission to configure notifications.

Read the documentation

In FreeMaint

Included in Starter

Automatic purchase requisitions in FreeMaint

Auto-create purchase requisitions appears on the Low Stock page for those who may configure the CMMS, on Starter. The Academy trial does not include it.

Read the documentation

Example

Plans and stock at Example Plant

At Example Plant, the course's snack bakery, wave 4 of the import, the preventive plans, waited for this lesson: a meter-based plan points to a meter, which must exist first. So the meters come first: one Runtime meter in hours per machine, with a Frequency of 7 days, on the forklifts EX-WH-FLT-01 to 03 and the compressors EX-UT-CMP-01 and EX-UT-CMP-02. A technician reads them on Mondays, through the plans that Schedule readings prepares. Once the meters exist, wave 4 imports the routine plans of the task list, each naming its asset and meter; the critical plans below are set up on screen, one at a time.

Each forklift gets a Meter Based plan, Threshold Value 250. EX-WH-FLT-01 shows 3,412 hours, but its last service, on paper, was at 3,300: you enter the dial as the Current Meter Reading and 3,550 as Next due at reading. From the dial alone, the first service would have come at 3,662, 112 hours late. The compressors get Hybrid plans, 2,000 running hours or 12 months, since the standby unit, EX-UT-CMP-02, runs little while its oil still ages; Required Parts lists one compressor oil filter.

The boiler, EX-UT-BLR-01, has a statutory inspection dated by its certificate: Time Based, every year, Fixed calendar (from due date), with Advance notification (days before due) at 45 days to book the inspector. The cold room's temperature gets a Gauge meter in °C on refrigeration unit 1, EX-CR-REF-01, since every meter belongs to an asset, with a Frequency of 1 day for the morning check. Its automated trigger, Above 5 °C, creates a work order titled “Cold room above 5 °C”: Recurring, with one day before re-triggering.

The compressor oil filter arrived with its minimum of 2. You add a Lead Time (days) of 10 and a Reorder Point of 3: the minimum plus what the compressors use in 10 days, well under one filter, rounded up to a whole one. The Maximum Stock Level is 6. Both stock events go to the storekeeper's role and to Admin, the maintenance manager's role. With Auto-create purchase requisitions on, at 3 filters left a draft requisition asks for 3. The storekeeper can submit only the requisitions they raised, so the maintenance manager submits this one, and the plant manager approves it.

Six common mistakes

  • A meter-based plan on a meter that nobody reads.
  • An Above trigger on an hour meter in place of a meter-based plan: it fires once, or on every reading.
  • From completion date on an inspection with a legal date: each late inspection pushes the next one later.
  • Current Meter Reading left empty on a machine in service: the next reading creates a work order at once.
  • A stocked part with no reorder point and no minimum: it only warns when the shelf is empty.
  • Counting on the import for the reorder point: it carries the minimum only.

Your turn: create a meter-based plan

The exercise of this lesson is checked in FreeMaint. In your own workspace, create a meter on an asset in Meters, then a plan with Schedule type Meter Based or Hybrid, that asset, that meter and a Threshold Value, saved Active, the default status.

What counts: an active plan that you created yourself, Meter Based or Hybrid, with a threshold above zero, on a meter that is active. Readings are not checked, though without them the plan will never fire. What does not: a Time Based plan, including the reading plan that Schedule readings prepares; a plan saved as Draft or Inactive; a plan someone else created, even if you edit it; an automated trigger, which is not a plan; sample data; a plan whose meter has been deactivated, or that was deleted before the check.

Meters and readings need the Starter plan. If your workspace is on Core and you manage it, starting this course opens a 30-day Academy trial there, once per workspace, that includes meters and their readings, and automated triggers. When the trial ends, your meter-based plan stays, but readings can no longer be entered on the meter, so it no longer fires.

Template for this lesson

Preventive and stock setup plan

Excel (.xlsx), blank, with automatic checks

Preventive and stock setup plan

Key takeaways

  • Choose the schedule type from what drives the wear: time, use, both, or a list of dates.
  • Fixed calendar keeps dated obligations on their date; From completion date restarts the interval from the job actually done.
  • A meter-based plan needs a meter, readings and the meter's current position; without readings it never fires.
  • A meter-based plan counts an interval from the last service; an automated trigger reacts when a reading crosses a limit.
  • Required parts travel to each work order as planned parts; stock moves only when a part is recorded as used.
  • Give every stocked part a minimum and a reorder point, and send the stock alerts to the people who order.

Exercise in FreeMaint

Do it in your own FreeMaint workspace, then check it here. Required: your certificate is issued once every exercise of this course is verified.

  • Create a meter-based preventive plan

    Create an active preventive plan yourself that a meter drives: choose “Meter Based” or “Hybrid”, then the meter and its interval.

    Required for the certificate.

Check your understanding

A few quick questions. Nothing is recorded.

  1. 1. A machine already shows 3,400 hours when you create its 250-hour meter-based plan, and you leave Current Meter Reading and Next due at reading empty. What happens at its next reading?
  2. 2. Where do you choose who receives the Low Stock Alert?
  3. 3. A compressor's 2,000-hour plan lists one oil filter in Required Parts. What happens to the stock when the plan creates its work order?
  4. 4. Auto-create work orders is switched off on a Hybrid plan. What happens when its meter reaches the threshold?
  5. 5. A pest-control contractor visits every year on the same two dates, 15 April and 1 October. Which schedule type fits?