Time-Based Scheduling

Fixed interval maintenance

5 min read
Print this section

Time-based PM runs on a fixed calendar: daily, weekly, monthly, quarterly, or custom.

Common Schedules

  • Daily safety checks (7 days/week)
  • Weekly lubrication (every 7 days)
  • Monthly filter replacement (every 30 days)
  • Quarterly calibration (every 90 days)
  • Annual fire system inspection (every 365 days)

Choosing which weekdays it can fall on

The interval is counted in days, so a plan set to every week falls on whatever weekday its start date happened to be. Under "On these days only" you can pick the weekdays the plan is allowed to fall on: a due date computed on any other day moves forward to the next one you selected. Leave every day unselected to keep the plan exactly where the interval places it. This is also the simplest way to keep due dates off Saturdays and Sundays. To plan a visit on several days each week, for example every Tuesday and Thursday, set Every 1 day and select those days: each selected day gets its own due date. With Every 1 week, the plan keeps one visit per week, on the first selected day it reaches.

Monthly plans: a day of the month or the Nth weekday

When the interval is in months, "Repeat on" sets how each month's date is chosen, from the start date: on the same day of every month (real calendar months — a plan on the 31st falls on the 28th or 29th in February, then on the 31st again), or on the first, second, third, fourth or last weekday of the month, such as the first Monday. With a weekday choice, "On these days only" does not apply. A plan counted from the completion date always keeps the day of the month of its last completion. Plans created before November 2026 count a month as 30 days until you pick one of these choices. On a fixed calendar, the dates follow the series of the start date: a date moved by "On these days only" or by the work schedule never shifts the following ones.

Seasonal plans: only in some months

Some work only happens part of the year: mowing every two weeks from May to October, snow plowing in winter, gutter cleaning in spring and fall. Under "Season", choose "Only in these months" and select the months the plan runs in. When a due date would fall outside them, the plan waits: the next due date moves to the first day of the next selected month (or, for a plan repeated on a day of the month, to that day in that month), and the interval continues from there. A plan every 2 weeks from May to October falls on October 17 and 31, then on May 1 and 15 of the following year. "On these days only" and the work schedule then apply as usual, so the last date of a season can move a few days into the next month. A day you set yourself with "Reschedule" is kept, even outside the season. "All year" removes the season. Seasons apply to time-based and hybrid plans; the mobile app shows the season, which is changed on the web.

Checking what the interval will do

Under “Every” and “Unit”, the form shows the next two due dates the plan will create, so a slip of the unit (years instead of days) shows before you save. It also warns you when there are more than two years between two work orders, and when the end date comes before the first or the second due date: the plan would then create no work order, or only one. These are warnings, never a block: an inspection every 5 or 10 years is perfectly valid.

Tip

If monthly inspections always pass, consider extending to bi-monthly.

Reschedule mode

Each schedule reschedules either from the completion date (the default — the next occurrence is set from when the work order is actually completed, so a late completion shifts the whole cycle) or on a fixed calendar (from the due date, regardless of when the work is completed — best for regulatory or compliance schedules). Choose this per schedule in the PM form.

Move the next due date

On the plan page, click the pencil next to “Next due”, pick the day and click “Reschedule”. The day is kept exactly as chosen and the plan’s tasks move with it. On a fixed calendar, the following due dates are then calculated from that day; on a plan rescheduled from completion, the work order already generated and not yet started moves with it. A day on or before a work order already generated is refused: choose a later day. Dragging the plan in the calendar does the same.

Changing the start date

On a fixed calendar, changing the start date or the interval re-plans the next due date on the series of the start date (start date + each interval), skipping any day already generated as a work order. On a plan rescheduled from completion, once it has been done, the next due date is calculated from the last completion and the start date no longer moves it: use the pencil next to “Next due”.