See all PM tasks on the calendar with color-coded status indicators.
Features
- Month/week/day views
- Green (on time), orange (upcoming), red (overdue)
- Click events for details
- Filter by asset, location, or team
- Filter by shift, when work orders are planned on shifts
Planned workload (Analytics tab)
On the Preventive Maintenance page, the Analytics tab opens with the “Planned workload” chart: the estimated hours of preventive work per week, projected from your plans over 8, 13 or 26 weeks. Plans with no estimated duration are named under the chart instead of being silently left out. Click a week to list, under the chart, the plans behind its bar — date, plan, asset, assignee and duration — and use the arrows to step to the previous or next week. To even out a heavy week, open one of those plans and move its next due date. Available on the Business plan and above.
HSE inspections on the calendar
The Calendar page also shows the inspections of your HSE register: on the day they are scheduled, or the day they were completed. They have their own filter, « HSE inspections », and clicking one opens it. They cannot be dragged to another day: reschedule them from the inspection itself. They appear for users who can read HSE, when the HSE module is enabled. In the mobile app they appear in the Calendar tab; tapping one opens it in your browser.
Tip
Related articles
Was this page helpful?