Features

  • Month/week/day views
  • Green (on time), orange (upcoming), red (overdue)
  • Click events for details
  • Filter by asset, location, or team

Planned workload (Analytics tab)

On the Preventive Maintenance page, the Analytics tab opens with the “Planned workload” chart: the estimated hours of preventive work per week, projected from your plans over 8, 13 or 26 weeks. Plans with no estimated duration are named under the chart instead of being silently left out. Click a week to list, under the chart, the plans behind its bar — date, plan, asset, assignee and duration — and use the arrows to step to the previous or next week. To even out a heavy week, open one of those plans and move its next due date. Available on the Business plan and above.

Tip

Review PM calendar weekly to prepare parts and assign technicians.