Specific Dates Scheduling
Seasonal or irregular maintenance on exact calendar dates
4 min read
Specific-dates scheduling runs a preventive maintenance on an explicit list of calendar dates instead of a fixed interval โ ideal for seasonal or irregular work such as pest control, HVAC season prep, or grounds upkeep.
When to use it
- Pest control concentrated in spring and summer
- HVAC summer tune-up and winter heating prep
- Grounds and landscaping at the start of each season
- Any plan whose dates don't fall on an even interval
How to set it up
- Create or edit a preventive maintenance plan
- Set the Schedule type to Specific dates
- Add each date the maintenance should run, and remove any you don't need
- Save โ the earliest upcoming date becomes the next due date
Tip
The list of dates repeats automatically every year, so you only enter them once.
Good to know
- Each date generates its own work order when it comes due โ turn on auto-create to do this automatically.
- Completing a work order does not move the other dates; the schedule stays fixed.
- Skip a single occurrence by cancelling its work order โ the remaining dates are unaffected.
Related articles
Was this page helpful?