Maintenance Reports

Operational metrics

5 min read
Print this section

Measure maintenance program effectiveness.

Metrics

  • PM vs Corrective ratio (target 80:20)
  • PM schedule adherence
  • Work order backlog
  • Technician productivity
  • First-time fix rate

Tip

If corrective > 40%, expand PM coverage.

Team completion rate

The completion rate on Analytics counts work orders AND inspections together, over the same period. Someone who only has inspections is no longer shown at 0%. When nothing at all was assigned in the period, the rate shows "—" rather than a zero, and those people are left out of the average. A multi-asset job counts one job per asset, never the order that groups them, and a shared inspection round counts on each crew member's row (once in the team totals).

Grouping by team (section)

On Analytics → Team, the "Group by" switch shows the same figures per team instead of per person — useful when a crew shares responsibility for scheduled inspections and no single name reflects the work. Work assigned to a team but to nobody in particular appears only in the team view. Requires the Business plan; items not assigned to any team are not counted.

Choosing which columns to show

The "Columns" button above the ranking table hides or shows each column — for example, keep only "Work orders completed" and "Inspections completed". Your choice is saved to your account, and "Reset columns" restores all of them.

Preventive maintenance KPIs

Analytics → Preventive computes the figures above from your own work orders, using the same period, asset, location and team filters as the other tabs. Each one prints the number it was calculated from; when nothing in the period can be measured it shows a dash, never 0%.

  • PM schedule compliance — planned jobs finished on or before their due date, as a share of the planned jobs that carried one
  • PM completion rate — planned jobs finished, as a share of those raised in the period
  • PM overdue — planned jobs past their due date and not finished
  • PM backlog — planned jobs still open, scheduled, in progress or on hold
  • Preventive share of maintenance — preventive work against corrective and emergency work

Tip

Compliance, completion, overdue and backlog count work orders raised by a maintenance plan. The preventive share counts every work order by its maintenance type, planned or not — which is why the two can differ.

Work by maintenance type

Reports → PM Ratio and the Reports screen of the mobile app show how your work orders split across the seven maintenance types, grouped into proactive (preventive, predictive, inspection), reactive (corrective, emergency) and improvement & projects. It reads the type set on each work order; cancelled work orders are not counted. The web report follows the period you pick; the mobile screen covers the last 12 months.

Tip

In the mobile app, the "Work by maintenance type" card has its own period chips — 7 d, 30 d, 90 d and 12 mo (the default) — and follows the team chips of the Reports screen.

Scheduled reports: period and formats

When you schedule a report, "Period covered" sets the time span it includes. Viewing and running report templates is free on every plan; scheduling their automatic e-mail delivery requires the Starter plan (schedules created earlier keep running).

  • "Previous calendar month" and "Previous calendar quarter" cover a whole month or quarter — ideal for a monthly report sent on the 1st
  • In a monthly schedule, day 31 ("Last day of month") means the last day of every month
  • Output formats: PDF (with charts), Excel and CSV
  • The e-mail states the exact period covered
  • The report is written in the language of the person who created the schedule: section titles, columns, statuses, priorities and dates. Names you typed yourself (categories, assets, failure causes) stay as entered.
  • To change the order of the sections in your copy of a template, go to Reports › Templates › Your copies, click Sections and move each section with the arrows (Business plan).
  • “Yearly” sends the report once a year, on the month and day you choose. Pair it with the period “Previous calendar year” for the year-end closing; “Year to date” covers 1 January up to the send date.
  • In the same Sections window, untick “Show in report” to leave a section out of your copy. At least one section must stay visible (Business plan).
  • “Report name” titles the report: it appears at the top of the PDF, in the e-mail subject and in the file name. Give each schedule its own name (e.g. “Monthly report”, “Yearly report”) so recipients tell them apart.
  • “Limit to” sends the same report for one area only: pick locations (sub-locations included) and/or work-order categories, and create one schedule per area manager. Purchase and energy sections are not limited and say so.
  • “Compare with the previous period” (ticked by default) shows ▲/▼ in the executive summary; untick it while your previous periods are not yet comparable, for example in your first months. A figure first recorded inside the previous period already shows “n/a”.
  • “Don’t send when the period has no work orders” skips the e-mail for a quiet period; “Send me a test” lets you pick the period of the test without changing the schedule.
  • “Month to date” covers the 1st of the current month up to the send date — handy for a test or a mid-month check. The executive summary then compares it with the same days of the previous month.

Who receives a scheduled report

Recipients are chosen among your colleagues who can read reports in FreeMaint. Creating or changing a schedule requires the “Reports › Create” and “Reports › Export” permissions; “Send me a test” requires only “Reports › Export”.

  • A scheduled report is read with the rights of its author (the person who saved the schedule): it never shows more than that person may see. Each recipient then receives the amounts (costs, spend, energy cost, asset values) only if they are allowed to see them; the others receive the same report without amounts, and the author is told once who received it without amounts.
  • E-mail addresses outside FreeMaint can no longer be added: invite the person to FreeMaint instead. Addresses added earlier keep receiving the report, always without amounts, and can be removed at any time.
  • A schedule that still goes to an outside address is paused if its author no longer sees the whole company; the author is told.
  • A recipient who leaves, or loses access to reports, is skipped at the next send; the author receives one notice, in the app and by e-mail — not one per send.
  • To receive the amounts, a recipient needs: for work-order costs, “Costs Reports”, “View costs in analytics and dashboards” and “View costs Work Orders”; for vendor spend and the cost of parts, “Costs Reports” plus “View prices Inventory” or “View prices Purchase Orders”; for energy cost, “View costs in analytics and dashboards”; for the replacement and purchase costs of assets, “View value Assets”.
  • “Send me a test” sends the report to you alone, with what you may see — never to the recipients. The recipients receive it at the scheduled time, each with the amounts they may see.

Monthly Maintenance Report

In the "Monthly Maintenance Report" template, "Work orders completed" now counts every work order finished in the period — completed, validated or closed. A new section, "Maintenance cost per asset", shows where the maintenance budget went, highest total first:

  • For each asset: the number of finished work orders and their labor, parts and external-service costs
  • The total maintenance cost for the period
  • The number of assets serviced
  • The average cost per asset
  • The cost amounts require the Business plan and the cost permissions listed under “Who receives a scheduled report”, for the author of the schedule and for each recipient. Below the Business plan the section shows “Maintenance cost per asset — available on the Business plan”; for a recipient without the permission it shows “Not included: the account this report is generated for does not have permission to view this data.”
  • The breakdown by failure cause counts only corrective and emergency work orders: preventive work has no failure to classify.
  • “Executive summary” puts the key figures first: total maintenance cost, assets serviced, work orders completed, preventive share and unplanned downtime, each compared with the previous period (the preventive share in percentage points). When the previous period has no data, the comparison reads “n/a”; with the executive summary shown, the cost-per-asset section no longer repeats the total cost and the assets serviced.
  • “WO by failure code (top 20)” counts corrective and emergency work orders by the failure codes technicians select (problem, cause, remedy). Problems, causes and remedies are ranked separately, each with its own chart.
  • Work orders without an asset are grouped under their location instead of a single “no asset” line. The same applies to “WO by asset (top 20)”.
  • Copies made before these two sections existed receive them hidden: tick “Show in report” in Sections to turn them on.
  • “Maintenance cost per asset” lists every asset serviced in the period (up to 200), with its preventive cost (preventive, predictive and inspection work) and its corrective cost (corrective and emergency work); improvement and project work count in the total only. The chart shows the 10 most expensive assets, each bar split preventive / corrective.
  • “Critical assets — repeat failures” lists the assets with two or more corrective work orders in the period, with their most frequent failure code and how many times it came back. It starts again with each period. Existing copies receive it hidden: tick “Show in report” in Sections.