Core Concepts & Terminology

Key terms and concepts used throughout FreeMaint

6 min read
Print this section

Understanding the core concepts and terminology helps you navigate FreeMaint effectively. This glossary covers the most important terms.

Maintenance Concepts

Work Order (WO)

A formal maintenance task with details, assignment, parts, and time tracking. Reference: WO-1, WO-2...

Preventive Maintenance (PM)

Scheduled maintenance at regular intervals (time-based) or based on equipment readings (meter-based) to prevent failures.

Intervention Request

A maintenance request submitted by any user, going through approval before becoming a work order. Reference: REQ-1, REQ-2...

Corrective Maintenance

Unplanned maintenance to restore equipment after a failure or breakdown.

Downtime

Period when an asset is not operational. FreeMaint tracks duration, reason, and cost.

Asset Concepts

Asset

Equipment or machinery requiring maintenance. Reference: ASS-1, ASS-2...

Asset Hierarchy

Parent-child relationship between assets (e.g., production line contains machines).

Meter

Measurement device on an asset. Types: RUNTIME, PRODUCTION, ODOMETER, GAUGE, COUNTER.

Meter Trigger

Automation rule firing when a reading meets a condition (ABOVE, BELOW, EQUALS, DELTA).

Organization Concepts

Company

Your organization. All data is isolated per company for security.

Location

Physical place in hierarchy: Building > Floor > Room. Reference: LOC-1...

Team

Group of users working together. Reference: TEAM-1...

Role

Set of permissions defining what a user can do. Every workspace starts with six core roles; add others from ready-made templates or build your own.

Tip

Work orders, requests, assets, PM plans and most other records get an automatic reference (WO-1, ASS-1, PM-1… by default) for easy identification and search. On the Enterprise plan, an admin can change the format under Company Settings → Numbering.

Was this page helpful?