Tasks break down a work order into trackable steps. You can edit a task's details anytime, and drag the handle (or use the up/down arrows) to set the order technicians follow.
Task Types
INSPECTION
Visual or physical equipment check
MEASUREMENT
Recording a value (temperature, pressure)
ACTION
Performing maintenance (replace, lubricate)
VERIFICATION
Confirming work was done correctly
Tip
Tip
Photo required to complete
Tick “Photo required to complete” on a task — when you add or edit it, on a task template step or on a preventive plan task — and it can only be marked done once a photo of it is attached: its step photo or a photo added to its note. Only people allowed to create tasks can change this setting, so the requirement cannot be unticked to finish without a photo. The mobile app asks for the photo before the task can be ticked.
Tip
Assign a task to a person
When a work order has two or more assignees, each task can be given to one of them, so everyone knows who does what. Only people already assigned to the work order can be chosen. The “Assigned to” field appears only when the work order has at least two assignees, and only for users allowed to assign work orders.
- Open the work order and go to the “Procedure & Tasks” tab (your administrator may have given it another name).
- Click “Add Task”, or use “Edit task” on an existing task.
- In “Assigned to”, pick a person, or “Unassigned” to give the task to no one in particular, then save.
Tip
Tip
A reading or a verdict completes the step
Saving the reading of a Measurement step, or choosing Pass or Fail on a Verification step, marks the step done, on the web as in the mobile app. Every step has a “Photo” button, on the web under the step and in the mobile app: add the photo first when the step requires one. In the mobile app, « Add Task » also sets the type, the unit and range, and under « More options » the tools, risks and work permit.
Every change to what a task asks for — its wording, “Photo required”, the work permit, its type or its range — and every task added or deleted is recorded in the work order's “Audit history”, with the value before and after.
Related articles
Was this page helpful?